What Is the Correct Kitchen Remodel Order? Step-by-Step Guide

Kitchen Remodel Order

Planning a kitchen remodel can feel confusing if you don’t know where to start. Many homeowners pick paint colors and cabinets first, then run into problems later. If you skip steps or do them out of sequence, you risk extra costs and a longer project timeline. This guide breaks down the correct kitchen remodel order in simple steps, so your project moves smoothly from start to finish. Whether you’re doing a small update or a full renovation, following the right kitchen remodeling process helps you avoid delays, failed inspections, and extra costs.
At High Quality Homes, we walk our clients through every step of this process to keep their remodel on track. 

Why the Order of a Kitchen Remodel Matters

A kitchen has many parts that work together, including plumbing, wiring, cabinets, countertops, and flooring. If one step happens too early or too late, it can damage other work. For example:

  • Flooring installed too soon can get scratched during demolition.
  • Countertops set before cabinets don’t fit right.
  • Plumbing closed up before inspection can fail code checks.

Following the correct kitchen renovation steps saves you from redoing work and keeps your budget on track.

Kitchen Remodel Order: Step-by-Step

1. Planning and Design

Start with a clear plan. Decide on your layout, style, and budget. Choose your Custom cabinets, countertops, flooring, and home appliances early so you know what will fit and what needs to be ordered ahead of time.

2. Permits and Approvals

If your remodel changes plumbing, electrical, or walls, you likely need permits. Check with your local building office before work begins.

3. Demolition

Remove old cabinets, flooring, and fixtures. This step clears the space and shows any hidden issues, like old wiring or water damage, before new work starts.

4. Structural and Framing Changes

If you’re moving walls, adding windows, or changing the layout, this happens next. Framing needs to be solid and level before anything else is installed.

5. Plumbing and Electrical Rough-In

Pipes and wires are placed inside the walls at this stage. This is called the “rough-in” because final connections come later. An inspector usually checks this work before walls are closed.

6. Insulation and Drywall

Once rough-in work passes inspection, walls are insulated and closed with drywall. This creates a clean surface for paint and finishes.

7. Painting

Paint the walls and ceiling before flooring and cabinets go in. This avoids drips and damage to new surfaces.

8. Flooring

Most kitchen remodeling checklists put flooring here, before cabinets are installed. This protects the floor and gives a cleaner finished look.

9. Cabinet Installation

With floors done, cabinets are installed next. This is a major visual step, and it sets up the space for countertops.

10. Countertops

Countertops are custom-measured after cabinets are in place, so this step comes after, not before.

11. Backsplash

Once countertops are set, the backsplash is installed to protect the wall behind sinks and stoves.

12. Plumbing and Electrical Fixtures

Sinks, faucets, outlets, and light fixtures are connected now that the surrounding surfaces are finished.

13. Appliances

New appliances like the stove, fridge, and dishwasher are installed near the end, once everything around them is complete.

14. Final Touches and Inspection

Add trim, hardware, and any last details. A final walkthrough and inspection confirm everything is done correctly and safely.

Kitchen Remodeling Checklist Table

StepTaskComes BeforeComes After
1Planning & DesignEverythingStarting Point
2PermitsDemolitionPlanning
3DemolitionFramingPermits
4Structural ChangesRough-inDemolition
5Plumbing/Electrical Rough-InDrywallStructural Changes
6Insulation & DrywallPaintingRough-in
7PaintingFlooringDrywall
8FlooringCabinetsPainting
9CabinetsCountertopsFlooring
10CountertopsBacksplashCabinets
11BacksplashFixturesCountertops
12FixturesAppliancesBacksplash
13AppliancesFinal TouchesFixtures
14Final TouchesFinal StepAppliances

Common Mistakes in the Kitchen Remodeling Process

  • Skipping permits to save time
  • Installing flooring before demolition is fully done
  • Ordering appliances too late, causing delays
  • Setting countertops before cabinets are level and fixed

Avoiding these mistakes keeps your kitchen remodel order on track and your budget under control.

DIY vs. Hiring a Contractor

FactorDIYProfessional Contractor
TimeLonger, especially for beginnersFaster, experienced crew
CostLower labor cost, higher risk of mistakesHigher upfront cost, fewer errors
PermitsYou handle applications yourselfOften handled for you
Best ForSimple updates like paint or hardwareFull remodels, plumbing, electrical, structural work

Conclusion

Following the right kitchen remodel order helps your project run smoothly, avoid costly mistakes, and pass inspections without delay. From planning to final touches, each step builds on the one before it. Use this kitchen remodeling checklist as your guide, and your kitchen renovation steps will lead to a space you’ll enjoy for years to come.

People Also Ask

What is the first step in a kitchen remodel?

The first step is planning and design. This includes your layout, budget, and choosing materials before any physical work starts.

Should flooring go in before or after cabinets?

In most kitchen renovation steps, flooring goes in before cabinets. This protects the floor and gives a cleaner finish, though some floating floors may go in after.

How long does a kitchen remodel take?

A full kitchen remodel usually takes several weeks to a few months, depending on the size of the project and whether structural or plumbing changes are involved.

Can I do a kitchen remodel myself?

Some parts, like demolition or painting, can be done yourself. Plumbing, electrical, and structural work are best left to licensed professionals for safety and code compliance.